56 online
 
Most Popular Choices
Share on Facebook 23 Printer Friendly Page More Sharing
General News   

More Problems at the Ft. Calhoun Nuclear Power Plant

By       (Page 3 of 4 pages) Become a premium member to see this article and all articles as one long page.   1 comment
Message Ron Freeman

BOTH EMERGENCY DIESEL GENERATORS SUPPLYING PLANT EMERGENCY BUSES PER PLANT PROCEDURE

"At approximately 0125 [hrs. CDT], the AquaDam providing enhanced flood protection for FCS [Ft. Calhoun Station] Unit 1 failed. At 0221, as a precautionary measure, DG-2 [Diesel Generator] was automatically started per plant procedure to divorce bus 1A4 from off-site power. At 0250, DG-1 was automatically started to divorce bus 1A3. Both Emergency Diesel Generators loaded on buses as designed. 345KV and 161KV off-site power remain available.

"This is reportable pursuant to 10CFR50.72(b)(3)(iv)(A), 'System Actuation of the Emergency Diesel Generators'. All safety related flood protection barriers remain in place.

"Current river level is 1006.5' MSL and stable. FCS remains in a NOUE [Notification of Unusual Event] due to high river level.

"NRC personnel stationed on-site for flood monitoring have been informed."

Power Reactor

Event Number: 46989

Facility: FORT CALHOUN
Region: 4 State: NE
Unit: [1] [ ] [ ]
RX Type: (1) CE
NRC Notified By: NATHAN SEID
HQ OPS Officer: DONALD NORWOOD

Notification Date: 06/26/2011
Notification Time: 12:22 [ET]
Event Date: 06/26/2011
Event Time: 10:45 [CDT]
Last Update Date: 06/26/2011

Emergency Class: NON EMERGENCY
10 CFR Section:
50.72(b)(2)(xi) - OFFSITE NOTIFICATION

Person (Organization):
RICK DEESE (R4DO)

Unit

SCRAM Code

RX CRIT

Initial PWR

Next Page  1  |  2  |  3  |  4

(Note: You can view every article as one long page if you sign up as an Advocate Member, or higher).

Must Read 2   Well Said 1   News 1  
Rate It | View Ratings

Ron Freeman Social Media Pages: Facebook page url on login Profile not filled in       Twitter page url on login Profile not filled in       Linkedin page url on login Profile not filled in       Instagram page url on login Profile not filled in

Retired Electrical Engineer.
Go To Commenting
The views expressed herein are the sole responsibility of the author and do not necessarily reflect those of this website or its editors.
Writers Guidelines

 
Contact AuthorContact Author Contact EditorContact Editor Author PageView Authors' Articles
Support OpEdNews

OpEdNews depends upon can't survive without your help.

If you value this article and the work of OpEdNews, please either Donate or Purchase a premium membership.

STAY IN THE KNOW
If you've enjoyed this, sign up for our daily or weekly newsletter to get lots of great progressive content.
Daily Weekly     OpEd News Newsletter
Name
Email
   (Opens new browser window)
 

Most Popular Articles by this Author:     (View All Most Popular Articles by this Author)

Second Nebraska Nuke Plant Declares "Unusual Event"

Nuclear Station Berm Collapses

More Problems at the Ft. Calhoun Nuclear Power Plant

The Irony of "Red State" Socialism

Inconsistencies In Reporting Japan's Nuclear Crisis

To View Comments or Join the Conversation:

Tell A Friend