The two companies that dominate the world in running e-logs are the inventors of the system Schlumberger and its competitor Halliburton, the same company that did the cement work.
8) Who ran the e-logs in this well? Who was responsible for the mud weight monitoring? How long was Halliburton or Schlumberger down this hole, running their e-logs? Did they get stuck? Call to publish the E-Log report.
A good team has all these people working together and helping each other out in a highly dangerous, noisy environment that often stinks of diesel fumes from the gigantic engines and pumps that pump the drilling mud through the miles of hollow drill pipe and circulate it back to surface.
Atomic Blast Proposal to seal well. I stress this is not a good idea.
I always reply to this idea by giving these analogies
(Note: You can view every article as one long page if you sign up as an Advocate Member, or higher).




