NIST fraud - WTC 7 Shear Studs

Message Chris Sarns

 By Judy Shelton and Chris Sarns

 

In their June 2004 report (and in the actual shop drawings*), NIST referred to the use of shear studs in World Trade Center 7. Shear studs are used to keep steel floor beams and girders in place; they impart stability and strength to buildings. But in their August 2008 final report, NIST re-worded their comments on shear studs to make it appear that none were used on the floor girders.

Why would they do this?  To know the answer, you need to understand NIST's collapse theory.  This is how it goes:

1.                  The key girder between column 79 and the exterior wall fails at floor 13.

2.                  Its failure causes the collapse of floors 13 through 6.

3.                  Column 79, now unsupported laterally by these floors, buckles and brings down the entire building.

This scenario is easier to posit if the key girder isn't being held firmly with shear studs. Thus, in the August 2008 report, NIST did what it had to do to make it more reasonable that the girder would fail: It magically omitted the shear studs.

Compare these two paragraphs. In the excerpted paragraph of the 2004 report, NIST says that studs were used with both beams and girders, although the studs "were not indicated on the design drawings for many of the core girders" (the girder associated with column 79, by the way, was not a core girder). In the 2008 report, however, not only does NIST drop the association of girders with shear studs ( first sentence of excerpted paragraph), but then they go on to imply that studs were not indicated at all on the girders (last sentence of excerpted paragraph):

June 2004   NIST L pg 6 [10 on pg counter]
Most of the beams and girders were made composite with the slabs through the use of shear studs. Typically, the shear studs were 0.75 in. in diameter by 5 in. long, spaced 1 ft to 2 ft on center. Studs were not indicated on the design drawings for many of the core girders .

http://wtc.nist.gov/progress_report_june04/appendixl.pdf

 

August 2008   NCSTAR 1-9 vol.1 pg 15 [59]
Most of the beams [the words "and girders" are deleted] were made composite with the slabs through the use of shear studs. Typically, the shear studs were 0.75 in. in diameter by 5 in. long, spaced [the words "1 to" are deleted] 2 ft on center**.  Studs were not indicated on the design drawings for  [the words "many of the core" are deleted] the girders.

http://nasathermalimages.s3.amazonaws.com/public/images/NIST_NCSTAR_1-9_Vol1_for_public_comment_unlocked.pdf

Then, in this paragraph of the 2008 report, they use the "absence" of shear studs to help make their case:

August 2008   NCSTAR 1A pg 49 [87]
At Column 79, heating and expansion of the floor beams in the northeast corner caused the loss of connection between the column and the key girder. Additional factors that contributed to the failure of the critical north-south girder were (1) the absence of shear studs that would have provided lateral restraint and (2) the one-sided framing of the east floor beams that allowed the beams to push laterally on the girders, due to thermal expansion of the beams.

http://nasathermalimages.s3.amazonaws.com/public/images/NIST_NCSTAR_1A_for_public_comment_unlocked.pdf

 

This deliberate distortion of the evidence can only be called fraud.  Even those who have accepted the official story must acknowledge that NIST's misstatements of its own report are not mistakes. They are bending the facts to accommodate a theory that cannot, so to speak, stand up.

 

*NCSTAR 1-9, Vol. 2, Fig. 12-4

http://www.opednews.com/populum/images/smallwhite.gif?orig=http://www.opednews.com/populum/images/smallwhite.gif?orig=http://img508.imageshack.us/img508/1164/figure124ic1.jpg

** "on center" - a term that means "apart"

Must Read 1   Supported 1   Valuable 1  
Rate It | View Ratings

Chris Sarns Social Media Pages: Facebook page url on login Profile not filled in       Twitter page url on login Profile not filled in       Linkedin page url on login Profile not filled in       Instagram page url on login Profile not filled in

I have been researching the FEMA and NIST reports on WTC 7 for the last two years. The first clip in this video is what got me involved. http://www.youtube.com/watch?v=A-c-6qkbxd0#GU5U2spHI_4
Related Topic(s): NIST, Add Tags
Add to My Group(s)
Go To Commenting
The views expressed herein are the sole responsibility of the author and do not necessarily reflect those of this website or its editors.
Writers Guidelines

 
Contact AuthorContact Author Contact EditorContact Editor Author PageView Authors' Articles
Support OpEdNews

OpEdNews depends upon can't survive without your help.

If you value this article and the work of OpEdNews, please either Donate or Purchase a premium membership.

STAY IN THE KNOW
If you've enjoyed this, sign up for our daily or weekly newsletter to get lots of great progressive content.
Daily Weekly     OpEd News Newsletter
Name
Email
   (Opens new browser window)
 

To View Comments or Join the Conversation:

Tell A Friend